Line of Sight

Audits · Circuits · Cabling · Network Installs

Connectivity is the backbone every modern space runs on.

From circuit provisioning and MDF/IDF audits to structured cabling and hardware migrations, we manage the physical scope so your projects and operations run without disruption.

1,000+
Internet Circuits Delivered
12+ Years
Telecom & Physical IT Infrastructure
400+
Commercial & Flex Sites Deployed & Supported

The problem

The building decides your timeline

Typical infrastructure lead times, in days. Whether you’re opening a new location, expanding bandwidth, or adding circuit redundancy, telecom lead times are the unmovable dates that decide your schedule.

Open end: permits and moratoriums have no fixed ceiling

Same data as a table
ItemLead time
New Fiber Build90–120+ days, plus permitting
On-Net Fiber Activation35–65+ days
Bandwidth Upgrades10–45+ days
MDF Readiness & Structured Cabling30–60+ days

A new fiber build runs 90 to 120 days — and that is before permits. City permitting can add months, and seasonal moratoriums can stop work from starting even when the approval is already in hand.

So the answer isn't ordering earlier. It's finding a provider already on-net in the building, where there's little or no build work to do at all.

That question is worth answering before you sign the lease — not after.

And on-net activation is still five sequential steps

  1. 1Order placed & processed1–2 wk
  2. 2Site survey completed1–2 wk
  3. 3Engineering SOW issued1–2 wk
  4. 4Fiber pulled & spliced1–2 wk
  5. 5NID installed & circuit activated1 wk

Steps 4 and 5 wait on the MDF — and the MDF waits on the room

A carrier will not splice into a dusty, half-built room, so none of it counts until the space is genuinely finished.

Low-voltage work is rarely what holds this up. The vendor starts early, pulls cable into the IT room and leaves it coiled, and sets the rack — they simply can't terminate until that rack is in. The real constraint is the construction happening around them: drywall, drop ceiling, and the electrical work.

What “MDF ready” actually means

  • Power and outlets at the rack
  • IT rack in place and bolted to the floor
  • Plywood backboard mounted for the carriers
  • Ventilation in place, or close to it

Which means your activation date is set by somebody else's drywall schedule. That seam between the trades is the one nobody owns, and it is where dates get lost.

21 to 42 days before a scope of work even exists, and 35 to 65 days in total when nothing goes wrong. None of it starts until the order is placed, and every step waits on the one before it — so a delay anywhere moves the activation date.

We manage the carrier milestones and coordinate the physical trades so you never lose weeks waiting on the seam between them.

What we do

Four reasons people call us

Circuit Procurement & Provisioning

Real pricing from the carriers that serve the address, not a coverage map.

Transparent pricing across every on-net and near-net carrier serving the property. Full order management from carrier site survey through demarc extension, test and turn-up — with primary and failover both scheduled to your target date. Independent advocate, not carrier-affiliated.

Network Installation & Migration

Physical hardware deployment and cutovers executed with minimal disruption.

Racking, stacking, patching, and labeling switches, firewalls, and access points. We partner seamlessly with your internal IT team or MSP to execute physical rollouts and cutover windows — delivering full as-built documentation at handover.

MDF/IDF Audits & Hardware Refreshes

For existing facilities, inherited spaces, or aging infrastructure.

Physical hardware auditing, patch panel tracing, rack cleanups, PoE power budgets, and circuit inventory reviews. We identify end-of-life hardware and bottlenecks, planning seamless switch, firewall, and AP replacements with minimal impact on daily operations.

Structured Cabling Oversight

Scoped properly the first time, so you aren't paying for revisits after the space is occupied.

Direct coordination of customer-provided or preferred low-voltage vendors — drop schedule planning, pathway routing, labeled terminations, Fluke certification results, and clean IT rack build-outs.

Existing spaces

Taking over space someone else built

Not every project starts with an empty floor. Acquisitions, lease renewals, and operators inheriting a site all begin the same way — a room full of equipment nobody documented, and an as-built drawing that stopped being accurate two tenants ago.

The audit comes before the plan. Hardware inventory, cabling and patch panel verification, power and PoE budgets, and a circuit inventory that reconciles what you are paying for against what is actually lit. Then end-of-life switch, firewall and access point replacement, and a cutover sequenced against a date rather than a hope.

The two numbers that surprise people: What the IT room can safely power, and what the circuits on the monthly bill are costing against what’s actually being delivered.

How it works

One schedule. One scope. One point of accountability.

The low-voltage vendor handles the design — yours if you have one, mine if you don't. I hold the scope and the schedule — the carrier coordination, the sequencing, and the closeout documentation. Physical infrastructure is deployed by licensed, insured low-voltage contractors working under my direction, and Layer 3 and configuration management remains with your internal IT team or designated MSP.

And if the schedule says the circuit won't land in time, I bring in a temporary connection so you open on the date you announced. That call has its own deadline — made too late, it doesn't help either.

The alternative is managing three vendors, two carrier installations, and separate cabling timelines yourself — and finding out too late which one pushed your delivery date.

Who we support

Built for teams managing physical space and live operations

  • Flex & Coworking OperatorsOpening new locations without day-one surprises, upgrading saturated bandwidth, and standardizing physical MDF/IDF closets across regional portfolios.
  • Landlords & Asset ManagersVerifying on-net carrier availability, auditing riser capacity, and delivering telecom-ready spec suites that prevent tenant move-in delays.
  • Relocating Tenants & GCsManaging carrier lead times, pathway routing, and structured cabling in lockstep so physical spaces open on schedule.
  • MSPs & IT TeamsProviding a trusted on-site pair of hands for rack-and-stack, patch panel cutovers, and physical demarc extensions without pulling senior engineers away from their desks.

About

Vincent Carminati

I've spent the last twelve years in telecom infrastructure — most recently leading IT infrastructure and telecom delivery for coworking operators, across hundreds of sites. Along the way I've delivered 1,000+ internet circuits, led 200+ circuit migrations across North America, and managed the migration of 50,000+ voice lines across 300+ commercial and flex sites — which means I've also seen most of the ways a build-out goes wrong.

At Essensys I scaled U.S. expansion as the sole pre-sales engineer, supporting 100+ new site openings a year — the accounts driving roughly 75% of company revenue — and owning the Capex/Opex infrastructure scope on every one of them.

Line of Sight exists because connectivity is the piece your Go Live date depends on, and it is the piece with the least slack in it. Everything else on a project or hardware cutover can absorb a day or two. An unmanaged circuit timeline cannot.

What I took from that is simple: the schedule is the deliverable. Cable and circuits are the straightforward part — sequencing them against a date that can't move is the actual job. It's why the first question I ask anyone is when they need to be in the space.

MBA · PMP Certified — full history on LinkedIn.

Contact

Send me an address

Tell me the building — or buildings — you're looking at and I'll come back with real pricing from the carriers that actually serve it — what it costs, whether it's on-net or a new build, and how long it will take. No charge and no obligation.

If you have a target occupancy date, project deadline, or contract renewal coming up, include it — that's the anchor everything gets planned around.

Quotes come back from the carriers, so this takes a few days rather than a few minutes. I'll tell you where it stands either way.

Not fixed yet? Use the first of the month — approximate is fine.

I’m looking for

Pick as many as apply.

Term length, if known
Bandwidth, if known

Tick more than one and I'll price each.

Goes straight to my inbox. I'll acknowledge the same day.